Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the gravityperks domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/pinamconstruction.com/commercial.pinamconstruction.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/pinamconstruction.com/commercial.pinamconstruction.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/pinamconstruction.com/commercial.pinamconstruction.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/pinamconstruction.com/commercial.pinamconstruction.com/wp-includes/functions.php on line 6114
Durham Tech Community College - Pinam Commercial Construction
  • image
  • image
  • image
  • image
  • image

PROJECT DESCRIPTION

In this project, we performed classroom renovations by taking the existing space and  fully demolishing it.  We then built a new reconfiguration of glass rooms.

The up-fit included new floor plans with HVAC relocations, along with sprinklers and walls from top to bottom, with finishes and built-in workstations for students.

  • Client: Durham Technical Community College
  • Builder: PINAM Construction, Commercial Division